| Workshop
Material |
| Presention
- Speaker |
PDF |
|
Stormwater
and “C.3.”:Background and What’s New - Jill Bicknell
|
 |
|
C.3 Compliance
for the Arbor Real Residential Development - Joe Teresi
|
 |
|
The Stanford
Football Stadium Project - C.3 Implementation from Design
through Construction and Beyond, Stanford University
- Karla Tomkins and John Lamon
|
 |
|
Sunnyvale
Development: Cherry Glen Plaza and The Classics at Las Palmas
- Jamie McLeod and Dustin Clark
|
 |
|
235 W. Main
Street, a Small Redevelopment Solution in Downtown Los Gatos
- Trish Duarte
|
 |
|
Implementing
Stormwater Requirements in New Development & Redevelopment
Projects - Municipal Regional Permit Provision C.3. - Dale
Bowyer
|
 |
|
Estimating
Costs to Determine Treatment and Flow Control BMP Feasibility
- Jim Howell
|
 |
|
Design and
Construction of Bioretention Units - Eric Biland
|
 |
|
Emeryville
- Blue and Green Desing - Peter Schultze-Allen
|
 |
|
Planting Guidelines
for Landscape-Based Stormwater Measures - Sarah Sutton
|
 |
|
Structural
Soils for Specific Sites- Dave Dockter
|
 |
|
BMP Vector
Considerations - Noor Tietze
|
 |