Home

About SCVURPPP

Program Elements

Awards

Management Committee

- Managers Information

- MRP Work Products

New/Redevelopment

- HMP

- C.3 Guidance Tools

Monitoring Program

Pollutants of Concern

- Copper/Nickel

- Mercury

- Pesticides

- PCBs

- Dioxins Compounds

- Sediment

Trash Management

Public Information/ Participation

Reports & Products

Spill Response

Pollution Control

SCVURPPP Workshops

Key Links

- Watershed Watch Campaign

- SCBWMI

- BASMAA

- CASQA

- RWQCB

Other Links

Contact Us

Site Map

Search

Get Acrobat Reader

 

 

 

Permit Provision C.3.
Date Submittal / Work Product  
C.3.b Development Project Approval Process
5/20/04 Summary of Major Changes to the Development Project Review Process
C.3.d Numeric Sizing Criteria For Pollutant Removal Treatment Systems
5/5/03 Sizing Criteria for Stormwater Treatment
C.3.e Operation and Maintenance of Treatment BMPs
1/27/03 Draft Guidance for BMP Operation and Maintenance Verification Programs (Permit Provision C.3.e) Link
5/5/03 Guidance for Implementing Permit Provision C.3.e (Operation and Maintenance of Treatment BMPs), Part 2 -- Ordinance or Policy Language Relating to Inspection and Maintenance of Stormwater Management Systems Link
5/7/03 Treatment Control Best Management Practice Fact Sheets Link
6/16/03 Guidance on Prioritization and Frequency of Stormwater Treatment Best Management Practice Inspections
9/24/03 Utility of Existing Stormwater BMP Cost Estimates
9/29/03 Stormwater Treatment BMP Inspection Program Elements
5/20/04 Information Regarding the Disposal of BMP Residuals at County Landfills
5/20/04 Guidance for Managing Data Relevant to Permit Provision C.3.e Reporting Requirements
C.3.f Limitation on Increase of Peak Stormwater Runoff Discharge Rates
3/1/02 Hydromodification Management Plan (HMP) Work Plan - Revised
  HMP Project Schedule Request
9/13/02 HMP Literature Review
9/13/02 Hydromodification Management Plan Literature Review--Executive Summary
3/3/03 Draft Hydromodification Management Plan
(Chapters 1-3)
Link
7/30/03 Hydromodification Management Plan, Draft Interim Report on Assessment of Lower Silver - Thompson Creek Subwatershed Link
11/1/04 Update on the SCVURPPP Hydromodification Management Plan (PowerPoint Presentation)
11/10/04 Hydromodification Management Plan Report - Revised Public Review Draft Link
4/21/05 Hydromodification Management Plan Final Report Link
C.3.h Alternative Certification of Adherence to Design Criteria for Stormwater Treatment Measures
9/22/06 Information on SCVURPPP List of Qualified Consultants Link
C.3.i Limitations on Use of Infiltration Treatment Measures - Infiltration and Groundwater Protection
5/16/03 Guidance for Use of Infiltration Measures for Stormwater Management in Santa Clara Valley  
7/9/03 Site Design Guidance for Review of Local Standards
7/11/03 Site Design Standards Review Submittal Guidance and Reporting Form
9/15/03 Results of Site Design Standards and Guidance Review
C.3.j Site Design Measures Guidance and Standards Development
5/16/03 Santa Clara Basin Model Development Principles
5/20/04 Developments Protecting Water Quality: A Guidebook of Site Design Examples
C.3.k Source Control Measures Guidance Development
9/15/02 Draft Model List of Source Control Measures
C.3.m Water Quality Review Processes
12/4/03 Guidance for Addressing Provision C.3.m, Water Quality Review Processes
C.3.n Reporting, including Pesticide Reduction Measures
4/17/02 C.3. Provision Data Needs
12/9/02 Model Conditions of Approval for
Pesticide Reduction in Landscaping Plans
5/16/03 Selection of Stormwater Treatment Measures for Santa Clara Valley
4/23/04 Provision C.3 Summary Data Form

Related Information
Document  
 New Permit Requirements for Development Projects: Implications for Municipalities
HMP Literature Review - Executive Summary
SCVURPPP’s Approach to Implementing the New Development Regulations
Municipal Storm Water Permit Revisions
Impacts to Cities and New Development Projects - 
San Francisco Bay Regional Quality Control Board
Progress in Implementing the New Storm Water 
Regulations for Development Projects

BASMAA Start At the Source

Using Site Design Techniques to Meet Development
Standards for Stormwater Quality
(A Companion Document to Start at the Source)
May 2003

A Survey of Installation and Maintenance Costs 
of Stormwater Treatment Facilities for BASMAA

Current Issues for New Development and Redevelopment
Status Report on the Hydromodification Management Plan (HMP) Project
SCVURPPP's Approach to Pollution Prevention in Municipal Activities
Progress in Implementing the New Storm Water Regulations for Development Projects
Everything You Wanted to Know About Stormwater but Were Afraid to Ask: The Santa Clara Valley Urban Runoff Pollution Prevention Program
Using Concepts of Work to Evaluate Hydromodification Impacts on Stream Channel Integrity and Effectiveness of Management Strategies
List of Current or Anticipated Group 1 Projects by Co-permittee
Data Analysis of Development Patterns for Group 2 Projects
 