| Permit
Provision C.3. |
| Date |
Submittal /
Work Product |
|
| C.3.b
Development Project Approval Process |
| 5/20/04 |
Summary
of Major Changes to the Development Project Review Process |
 |
| C.3.d
Numeric Sizing Criteria For Pollutant Removal Treatment Systems |
| 5/5/03 |
Sizing
Criteria for Stormwater Treatment |
 |
| C.3.e
Operation and Maintenance of Treatment BMPs |
| 1/27/03 |
Draft
Guidance for BMP Operation and Maintenance Verification Programs
(Permit Provision C.3.e) |
Link |
| 5/5/03 |
Guidance
for Implementing Permit Provision C.3.e (Operation and Maintenance
of Treatment BMPs), Part 2 -- Ordinance or Policy Language Relating
to Inspection and Maintenance of Stormwater Management Systems |
Link |
| 5/7/03 |
Treatment
Control Best Management Practice Fact Sheets |
Link |
| 6/16/03 |
Guidance
on Prioritization and Frequency of Stormwater Treatment Best
Management Practice Inspections |
 |
| 9/24/03 |
Utility
of Existing Stormwater BMP Cost Estimates |
 |
| 9/29/03 |
Stormwater
Treatment BMP Inspection Program Elements |
 |
| 5/20/04 |
Information
Regarding the Disposal of BMP Residuals at County Landfills |
 |
| 5/20/04 |
Guidance
for Managing Data Relevant to Permit Provision C.3.e Reporting
Requirements |
 |
| C.3.f
Limitation on Increase of Peak Stormwater Runoff Discharge Rates
|
| 3/1/02 |
Hydromodification
Management Plan (HMP) Work Plan - Revised |
 |
| |
HMP
Project Schedule |
Request |
| 9/13/02 |
HMP
Literature Review |
 |
| 9/13/02 |
Hydromodification
Management Plan Literature Review--Executive Summary |
 |
| 3/3/03 |
Draft
Hydromodification Management Plan
(Chapters 1-3) |
Link |
| 7/30/03 |
Hydromodification
Management Plan, Draft Interim Report on Assessment of Lower
Silver - Thompson Creek Subwatershed |
Link |
| 11/1/04 |
Update on the SCVURPPP Hydromodification Management Plan (PowerPoint
Presentation) |
 |
| 11/10/04 |
Hydromodification Management Plan Report - Revised Public Review
Draft |
Link |
| 4/21/05 |
Hydromodification Management Plan Final Report |
Link |
| C.3.h
Alternative Certification of Adherence to Design Criteria for
Stormwater Treatment Measures |
| 9/22/06 |
Information
on SCVURPPP List of Qualified Consultants |
Link |
| C.3.i
Limitations on Use of Infiltration Treatment Measures - Infiltration
and Groundwater Protection |
| 5/16/03 |
Guidance
for Use of Infiltration Measures for Stormwater Management in
Santa Clara Valley |
|
| 7/9/03 |
Site
Design Guidance for Review of Local Standards |
 |
| 7/11/03 |
Site
Design Standards Review Submittal Guidance and Reporting Form |
 |
| 9/15/03 |
Results
of Site Design Standards and Guidance Review |
 |
| C.3.j
Site Design Measures Guidance and Standards Development |
| 5/16/03 |
Santa
Clara Basin Model Development Principles |
 |
| 5/20/04 |
Developments
Protecting Water Quality: A Guidebook of Site Design Examples |
 |
| C.3.k
Source Control Measures Guidance Development |
| 9/15/02 |
Draft
Model List of Source Control Measures |
 |
| C.3.m
Water Quality Review Processes |
| 12/4/03 |
Guidance
for Addressing Provision C.3.m, Water Quality Review Processes |
 |
| C.3.n
Reporting, including Pesticide Reduction Measures |
| 4/17/02 |
C.3.
Provision Data Needs |
 |
| 12/9/02 |
Model
Conditions of Approval for
Pesticide Reduction in Landscaping Plans |
 |
| 5/16/03 |
Selection
of Stormwater Treatment Measures for Santa Clara Valley |
 |
| 4/23/04 |
Provision
C.3 Summary Data Form |
 |