Home

About SCVURPPP

Program Elements

Awards

Management Committee

- Managers Information

- MRP Work Products

New/Redevelopment

- HMP

- C.3 Guidance Tools

Monitoring Program

Pollutants of Concern

- Copper/Nickel

- Mercury

- Pesticides

- PCBs

- Dioxins Compounds

- Sediment

Trash Management

Public Information/ Participation

Reports & Products

Spill Response

Pollution Control

SCVURPPP Workshops

Key Links

- Watershed Watch Campaign

- SCBWMI

- BASMAA

- CASQA

- RWQCB

Other Links

Contact Us

Site Map

Search

Get Acrobat Reader

 

 

 

On October 17, 2001, the Regional Board adopted Order 01-119, which amended the Program’s Permit Provision C.3., New and Redevelopment Requirements.  These requirements include:

  • Numeric design standards for sizing stormwater treatment controls;
  • Limits on increases in peak stormwater discharges from new or redevelopment sites that may increase erosion in creeks;
  • Requirements for operation and maintenance of stormwater controls;
  • Requirements for site design and source control measures;
  • Definition of a minimum project size, based on amount of impervious surface created, for which the design standards, control measures, peak flow limitations, and maintenance requirements apply;
  • Requirements for changes to General Plans and environmental review processes to provide authority to implement the requirements;
  • Reporting requirements; and
  • Schedule for implementation.

On July 20, 2005, the Regional Water Board adopted Order R2-2005-0035, which again amended the Program’s Permit Provision C.3., New and Redevelopment Requirements. This Order includes:

  • An revised definition for "Group 2" projects (those that create between 10,000 square feet and 1 acre of impervious surface) that allows phased implementation of C.3. requirements based on the project's land use, beginning October 20, 2005; and
  • The key provisions of the Program's Hydromodification Management Plan Report (April 2005) and the requirement to begin implementation of these provisions on October 20, 2005.

Work Plans to implement Provision C.3. were submitted to the Regional Board on March 1, 2002, and revised on September 15, 2002. 

In accordance with Permit Provision C.3., the Program submitted several work products to the Regional Board. Recent highlights include:

Standard Stormwater Treatment BMP Inspection Data Collection Form

Bay Area Hydrology Model Workshop Presentation

Information on SCVURPPP List of Qualified Consultants

HMP Applicability Maps

“HMP 101” Hydromodification Management Plan for Santa Clara Valley – Guidance for Local Implementation (Presentation) October 25, 2006

Bay Area Hydrology Model - A Tool for Analyzing Hydromodification
Effects of Development Projects and Sizing Solutions
September 26, 2006

Hydromodification Management Plan Final Report (April 2005)

C.3 Stormwater Handbook  (May 2004 Final)

C.3 Stormwater Handbook Updates (September 2006)

C.3 Stormwater Handbook Complete (Large File)

C.3 Stormwater Handbook Appendix Complete (Large File)

Start at the Source Manual (BASMAA 1999)

Developments Protecting Water Quality: A Guidebook of Site Design Examples - Revised February 2007

Site Design Dialogues - October 2003 - January 2004

Example BMP Inspection and Maintenance Checklists

Update on the SCVURPPP Hydromodification Management Plan (PowerPoint Presentation)

Compare and Contrast Development Policies

 

 

(408) 720-8833     Fax (408) 720-8812    Hotline: (800) 794-2482